Civil Works for Wulong Wujiang River Flood Management Work-Flood Protection Dike 3招标公告
日期:2015-03-24 09:57
rts, with the construction period of 17 months
after the Commencement of Works.
Dike 2:
K0+900~K1+760 and 1 box culvert, with the construction period of 17 months
after the Commencement of Works.
Dike 3:
K1+760~K2+634.89 and 2 box culverts, with the
construction period of 17 months
after the Commencement of Works.

3. International
competitive bidding (ICB) will be conducted in accordance with ADB’s
Single-Stage: One Envelope without prequalification procedure and is open to
all B
19/31 下一页 上一页 首页 尾页
返回 |  刷新 |  WAP首页 |  网页版  | 登录
06/30 20:10