日期:2015-03-24 09:58
verts, with the construction period of 17 months
after the Commencement of Works.
Dike 2:
K0+900~K1+760 and 1 box culvert, with the construction period of 17 months
after the Commencement of Works.
Dike 3:
K1+760~K2+634.89 and 2 box culverts, with the
construction period of 17 months
after the Commencement of Works.
3. International
competitive bidding (ICB) will be conducted in accordance with ADB’s
Single-Stage: One Envelope without prequalification procedure and is open to
all